The Wiki for Tale 8 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Difference between revisions of "Gravel"
Peacefulness (talk | contribs) |
|||
(9 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Languages}} | {{Languages}} | ||
− | |||
− | |||
− | == | + | {{Item |
+ | | name = Gravel | ||
+ | | image = Gravel.png | ||
+ | | weight = 1 | ||
+ | | bulk = 1 | ||
+ | }} | ||
+ | |||
+ | ==Sources== | ||
Made by smashing [[Medium Stones]] with a [[Sledgehammer]] | Made by smashing [[Medium Stones]] with a [[Sledgehammer]] | ||
Line 15: | Line 20: | ||
*''5000 required to research [[Basic Metal Treatment]]'' | *''5000 required to research [[Basic Metal Treatment]]'' | ||
*''4800 needed to research [[Masonry]]'' | *''4800 needed to research [[Masonry]]'' | ||
+ | |||
+ | ==T8 Equipment System== | ||
+ | |||
+ | {{8}} The T8 Equipment System has the option to equip the sledgehammer. If you equip the sledgehammer you cannot smack the stones. Do not equip the sledgehammer and the process is the same as pre-T8 Equipment System. | ||
+ | |||
+ | It can be expected that this will be altered in future updates. | ||
==How to Make== | ==How to Make== | ||
+ | [[File:Stones.png]]<br> | ||
The [[Medium Stones]] must first be dropped on the ground before being smashed (hot key S to smash, or click on the stone to bring up a menu option). As smashed stones roll around a fair bit, plenty of space is advised. | The [[Medium Stones]] must first be dropped on the ground before being smashed (hot key S to smash, or click on the stone to bring up a menu option). As smashed stones roll around a fair bit, plenty of space is advised. | ||
Line 24: | Line 36: | ||
:* [[Split Stone]] | :* [[Split Stone]] | ||
:* [[Smashed Stone]] | :* [[Smashed Stone]] | ||
− | :* | + | :* Gravel |
Medium Stones -> cracked stones -> broken stones -> split stones -> smashed stone -> Gravel. Continue smashing the byproducts until everything is broken into gravel. | Medium Stones -> cracked stones -> broken stones -> split stones -> smashed stone -> Gravel. Continue smashing the byproducts until everything is broken into gravel. | ||
One medium stone can produce as little as one gravel, but usually over 100 gravel. The splitting is random, so there is no way to tell how much you will get. Smashing a large number of stones will even out the random part though, and about 50-60 gravel per medium stone is reasonable. | One medium stone can produce as little as one gravel, but usually over 100 gravel. The splitting is random, so there is no way to tell how much you will get. Smashing a large number of stones will even out the random part though, and about 50-60 gravel per medium stone is reasonable. | ||
− | :* 12 Medium gave 716 gravel (T7), which is roughly 60 gravel per [[Medium | + | :* 12 Medium gave 716 gravel (T7), which is roughly 60 gravel per [[Medium Stones|medium stone]] |
− | :* 50 Medium gave 2896 gravel (T7), which is roughly 58 gravel per [[Medium | + | :* 50 Medium gave 2896 gravel (T7), which is roughly 58 gravel per [[Medium Stones|medium stone]] ~ Balthazarr |
− | * When smashing stones, there are two basic things that happen when you smash the stone: | + | * When smashing stones, there are two basic things that happen when you smash the stone: |
1) A "chip" of 1 gravel stays at your feet and the stone rolls away with no change in size, it can be "scooped" very quickly without any animation! <br> | 1) A "chip" of 1 gravel stays at your feet and the stone rolls away with no change in size, it can be "scooped" very quickly without any animation! <br> | ||
2) The stone splits into 1 to 3 stones one size smaller than the original <br> | 2) The stone splits into 1 to 3 stones one size smaller than the original <br> | ||
− | (if the new sized of stone is gravel, each will be 1 to 3 gravel and have to be picked up normally) | + | (if the new sized of stone is gravel, each will be 1 to 3 gravel and have to be picked up normally) |
*Warning: When you choose to smash a stone (either hotkey or menu) and while your avatar is running towards the stone, if you right click before the stone is smashed, the stone will still display but will disappear next time you click on it and you will have lost that stone! - Zotep | *Warning: When you choose to smash a stone (either hotkey or menu) and while your avatar is running towards the stone, if you right click before the stone is smashed, the stone will still display but will disappear next time you click on it and you will have lost that stone! - Zotep | ||
Line 45: | Line 57: | ||
[[Category:Resources]] | [[Category:Resources]] | ||
+ | |||
+ | {{L|en}} |
Latest revision as of 08:05, 25 January 2019
English | français |
Gravel | ||
---|---|---|
(Item) | ||
|
||
|
Sources
Made by smashing Medium Stones with a Sledgehammer
Cost
Uses
- 250 Gravel used to make a batch of 250 Concrete in a Clinker Vat.
Research and Tuition
- 5000 required to research Basic Metal Treatment
- 4800 needed to research Masonry
T8 Equipment System
The T8 Equipment System has the option to equip the sledgehammer. If you equip the sledgehammer you cannot smack the stones. Do not equip the sledgehammer and the process is the same as pre-T8 Equipment System.
It can be expected that this will be altered in future updates.
How to Make
The Medium Stones must first be dropped on the ground before being smashed (hot key S to smash, or click on the stone to bring up a menu option). As smashed stones roll around a fair bit, plenty of space is advised.
Medium Stones -> cracked stones -> broken stones -> split stones -> smashed stone -> Gravel. Continue smashing the byproducts until everything is broken into gravel.
One medium stone can produce as little as one gravel, but usually over 100 gravel. The splitting is random, so there is no way to tell how much you will get. Smashing a large number of stones will even out the random part though, and about 50-60 gravel per medium stone is reasonable.
- 12 Medium gave 716 gravel (T7), which is roughly 60 gravel per medium stone
- 50 Medium gave 2896 gravel (T7), which is roughly 58 gravel per medium stone ~ Balthazarr
- When smashing stones, there are two basic things that happen when you smash the stone:
1) A "chip" of 1 gravel stays at your feet and the stone rolls away with no change in size, it can be "scooped" very quickly without any animation!
2) The stone splits into 1 to 3 stones one size smaller than the original
(if the new sized of stone is gravel, each will be 1 to 3 gravel and have to be picked up normally)
- Warning: When you choose to smash a stone (either hotkey or menu) and while your avatar is running towards the stone, if you right click before the stone is smashed, the stone will still display but will disappear next time you click on it and you will have lost that stone! - Zotep
Required By
Basic Metal Treatment, Concrete, Masonry, Tongs, Treated Metal
Produced By