The Wiki for Tale 8 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Copper Pipe
Jump to navigation
Jump to search
English | français |
Copper Pipe | ||
---|---|---|
Copper Pipe | ||
(Item) | ||
|
||
|
Source
Copper pipe is made in a forge that has been upgraded with a pair of Pinch Rollers. Each copper pipe requires 5 Copper and takes 5 minutes to cool.
Uses
- 5 needed to build an Aqueduct Tower
- 20 needed to build a Persephone Furnace
- 35 needed to build a Steam Distaff
- 50 needed to build a Chemical Bath
- 100 needed to build an Ancient Forge
Required By
Aqueduct Tower, Chemical Bath, Large Steam Engine, Medium Steam Engine, Persephone Furnace, Small Steam Engine, Steam Distaff, Steam Kiln, Test of Dancing Waters
Produced By
Forge, Master's Forge, Student's Forge