Difference between revisions of "Compression Furnace"
From A Wiki in the Desert
(One intermediate revision by one other user not shown) | |||
Line 5: | Line 5: | ||
| size = {{Area | 15 | 11}} | | size = {{Area | 15 | 11}} | ||
| requirements = | | requirements = | ||
− | * [[requires::Mining | + | * [[requires::Mining 1]] |
| material1 = [[requires::Clay]] | | material1 = [[requires::Clay]] | ||
| qty1 = 100 | | qty1 = 100 | ||
Line 17: | Line 17: | ||
== Sources == | == Sources == | ||
− | This building becomes available after you have learned the [[Mining | + | This building becomes available after you have learned the [[Mining 1]] tech and the {{RequireSkill | Mining | 1}} skill. |
Compare all [[Furnace]]s. | Compare all [[Furnace]]s. | ||
Line 23: | Line 23: | ||
== Cost == | == Cost == | ||
− | * {{Require | 100 | Clay}} | + | * {{Require | 100 | Clay | verified=true}} |
− | * {{Require | 3 | Crucibles}} | + | * {{Require | 3 | Crucibles | verified=true}} |
− | * {{Require | 200 | Firebricks}} | + | * {{Require | 200 | Firebricks | verified=true}} |
− | * {{Require | 5 | Iron Bars}} | + | * {{Require | 5 | Iron Bars | verified=true}} |
== Use == | == Use == |
Latest revision as of 04:08, 10 April 2024
Compression Furnace | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
(Building) | ||||||||||
Location | ||||||||||
Compound | ||||||||||
Size | ||||||||||
15 x 11 | ||||||||||
Requirements | ||||||||||
|
Sources
This building becomes available after you have learned the Mining 1 tech and the Mining 1 (Skill) skill.
Compare all Furnaces.
Cost
- 100 Clay
✓ - 3 Crucibles
✓ - 200 Firebricks
✓ - 5 Iron Bars
✓
Use
- Smelt all known Ore into
Uses Charcoal for fuel.
Operation
- Holds up to 500 ore
- Holds up to 20 Charcoal
- Burns 1 Charcoal per minute for a maximum of 20 minutes
- The theoretical time to generate one metal appears to be 40000 / ore amount. The actual time is modified by rounding. (See the discussion page for more details.)
Recipes
Confirmed | Ore | Charcoal | Metal Result | % Yield (Metal per Ore) | CC per Metal | Clinker |
---|---|---|---|---|---|---|
Yes | 500 | 20 | 15 | 3.0 | 1.33 | |
Yes | 500 | 19 | 15 | 3.0 | 1.27 | |
Yes | 500 | 16 | 12 | 2.4 | 1.33 | 488 |
Yes | 500 | 15 | 12 | 2.4 | 1.25 | |
Yes | 500 | 14 | 11 | 2.2 | 1.27 | |
Yes | 500 | 13 | 10 | 2.0 | 1.3 | |
Yes | 500 | 10 | 8 | 1.6 | 1.25 | |
Yes | 500 | 4 | 3 | 0.6 | 1.333 | |
Yes | 500 | 3 | 3 | 0.6 | 1 | |
Yes | 500 | 2 | 2 | 0.4 | 1 | |
Yes | 500 | 1 | 1 | 0.2 | 1 | |
Yes | 484 | 20 | 15 | 3.1 | 1.33 | |
Yes | 483 | 20 | 14 | 2.9 | 1.43 | |
Yes | 483 | 19 | 14 | 2.9 | 1.36 | |
Yes | 466 | 20 | 14 | |||
Yes | 461 | 20 | 14 | |||
Yes | 460 | 20 | 14 | |||
Yes | 459 | 20 | 14 | |||
Yes | 458 | 20 | 14 | |||
Yes | 400 | 20 | 12 | |||
Yes | 399 | 20 | 12 | 1.67 | ||
Yes | 390 | 20 | 12 | 3.08 | 1.67 | |
Yes | 358 | 20 | 11 | |||
Yes | 344 | 20 | 10 | |||
Yes | 300 | 13 | 6 | 2.0 | 2.17 | |
200 | 20 | 6 | 3.0 | 3.33 | ||
200 | 19 | 6 | 3.0 | 3.17 |
Note: the 200 ore/18 charcoal was performed by opening the furnace at about 18:15 into the process recovering left over charcoal and metal.
|