A Wiki in the Desert
Log in

Difference between revisions of "Technology/Steam Mechanics/3"

From A Wiki in the Desert
(→‎top: resetting research)
 
(2 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
   |image=
 
   |image=
 
   |started=2022-01-02T04:39:18-05:00
 
   |started=2022-01-02T04:39:18-05:00
   |inprogress=no
+
   |inprogress=yes
 
   |champion=
 
   |champion=
 
   |points=20
 
   |points=20
 
   |ended=2022-01-05T20:53:53-05:00
 
   |ended=2022-01-05T20:53:53-05:00
   |complete=no
+
   |complete=yes
 
}}
 
}}
  
=== Research Costs ===
+
== Research Costs ===
* 500 Petroleum                                 (Done)
+
* 50000 [[Petroleum]]
* 300 Hard, Rotproof Treated boards             (Done)
+
* 30000 Hard, Rotproof Treated boards
* 150Bolts                                      (Done)
+
* 15000 [[Bolts]]
* 15 Washers
+
* 1500 [[Washers]]
* 20 Full Water container                       (Done)
+
* 2000 Full Water container
* 10 Leather
+
* 1000 [[Leather]]
* 5 Brass small gear                            (Done)
+
* 500 [[Brass Small Gear]]
* 15 Steel wire                                (Done)
+
* 1500 [[Steel Wire]]
* Small Steam Engine  
+
* 30 [[Small Steam Engine]]
* Medium Steam Engine  
+
* 20 [[Medium Steam Engine]]
* Large Steam Engine  
+
* 10 [[Large Steam Engine]]
* High Pressure Steam Engine  
+
* 10 [[High Pressure Steam Engine]]
* 5 Cobalt sheeting: Hard, Corrosion resistant
+
* 500 [[Cobalt Sheeting]]: Hard, Corrosion resistant
* 2 Copper sheeting: stainless
+
* 200 [[Copper Sheeting]]: stainless
* 2 Iron bars                                  (Done)
+
* 200 [[Iron Bars]]
* 1 Iron medium gear                          (Done)
+
* 100 [[Iron Medium Gear]]
* 5 Lubricating Oil
+
* 500 [[Lubricating Oil]]
* 5 Thermometer                               (Done)
+
* 50 [[Thermometer]]
* 1 Screw gears
+
* 20 [[Screw Gear]]
  
 
=== Prerequisites ===
 
=== Prerequisites ===

Latest revision as of 12:54, 5 May 2024

Steam Mechanics 3
(Technology - Architecture)
Research
Status Completed
Time
Expected Unknown
Total 16:14:35


Description

Uses

Research Costs =

Prerequisites