The Wiki for Tale 8 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.
If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.
Compression Furnace
Jump to navigation
Jump to search
English | français |
Compression Furnace | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
(Building) | ||||||||||
Location | ||||||||||
Compound | ||||||||||
Size | ||||||||||
15 × 11 | ||||||||||
Requirements | ||||||||||
|
Sources
This building becomes available after you have learned the Metallurgy tech.
Compare all Furnaces.
Cost
- 100 Clay
- 3 Crucible
- 200 Firebricks
- 5 Iron Bars
Use
- Smelt any ore to produce metal. For example:
- Smelt Copper Ore to produce Copper
- Smelt Iron Ore to produce Iron
- Smelt Tin Ore to produce Tin
- Smelt Lead Ore to produce Lead
Uses Charcoal for fuel.
Operation
- Holds up to 500 ore
- Holds up to 20 Charcoal
- Burns 1 Charcoal per minute for a maximum of 20 minutes
- The theoretical time to generate one metal appears to be 40000 / ore amount. The actual time is modified by rounding. (See the discussion page for more details.)
Recipes
Confirmed | Ore | Charcoal | Metal Result | % Yield (Metal per Ore) | CC per Metal | Clinker |
---|---|---|---|---|---|---|
Yes | 500 | 20 | 15 | 3.0 | 1.33 | |
Yes | 500 | 19 | 15 | 3.0 | 1.27 | |
Yes | 500 | 16 | 12 | 2.4 | 1.33 | 488 |
Yes | 500 | 15 | 12 | 2.4 | 1.25 | |
Yes | 500 | 14 | 11 | 2.2 | 1.27 | |
Yes | 500 | 13 | 10 | 2.0 | 1.3 | |
Yes | 500 | 10 | 8 | 1.6 | 1.25 | |
Yes | 500 | 4 | 3 | 0.6 | 1.333 | |
Yes | 500 | 3 | 3 | 0.6 | 1 | |
Yes | 500 | 2 | 2 | 0.4 | 1 | |
Yes | 500 | 1 | 1 | 0.2 | 1 | |
Yes | 484 | 20 | 15 | 3.1 | 1.33 | |
Yes | 483 | 20 | 14 | 2.9 | 1.43 | |
Yes | 483 | 19 | 14 | 2.9 | 1.36 | |
Yes | 466 | 20 | 14 | |||
Yes | 399 | 20 | 12 | 1.67 | ||
Yes | 390 | 20 | 12 | 3.08 | 1.67 | |
Yes | 300 | 13 | 6 | 2.0 | 2.17 | |
200 | 20 | 6 | 3.0 | 3.33 | ||
200 | 19 | 6 | 3.0 | 3.17 |
Note: the 200 ore/18 charcoal was performed by opening the furnace at about 18:15 into the process recovering left over charcoal and metal.
|