The Wiki for Tale 8 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Compression Furnace

From A Wiki in the Desert
Revision as of 07:36, 31 July 2018 by BradsBot (talk | contribs) (→‎Recipes: Adding English language flag using the "L" template)
Jump to navigation Jump to search
English français
Warning.png

Information From Tale 7
The information in this article is based on Tale 7 and has not yet been verified in Tale 8. Please use such information with care as things may have changed in Tale 8.
If you are able to confirm and provide updated information, please consider updating this article and removing this warning.


CompressionFurnace.png
Size 15x11
Where Compound

Used for making metals from ore.



Sources

This building becomes available after you have learned the Metallurgy tech.

Compare all Furnaces.


Cost


Use

Uses Charcoal for fuel.


Operation

  • Holds up to 500 ore
  • Holds up to 20 Charcoal
  • Burns 1 Charcoal per minute for a maximum of 20 minutes
  • The theoretical time to generate one metal appears to be 40000 / ore amount. The actual time is modified by rounding. (See the discussion page for more details.)


Recipes

Confirmed Ore Charcoal Metal Result % Yield (Metal per Ore) CC per Metal Clinker
Yes 500 20 15 3.0 1.33
Yes 500 19 15 3.0 1.27
Yes 500 16 12 2.4 1.33 488
Yes 500 15 12 2.4 1.25
Yes 500 14 11 2.2 1.27
Yes 500 13 10 2.0 1.3
Yes 500 10 8 1.6 1.25
Yes 500 4 3 0.6 1.333
Yes 500 3 3 0.6 1
Yes 500 2 2 0.4 1
Yes 500 1 1 0.2 1
Yes 484 20 15 3.1 1.33
Yes 483 20 14 2.9 1.43
Yes 483 19 14 2.9 1.36
Yes 466 20 14
Yes 390 20 12 3.08 1.67
Yes 300 13 6 2.0 2.17
200 20 6 3.0 3.33
200 19 6 3.0 3.17

Note: the 200 ore/18 charcoal was performed by opening the furnace at about 18:15 into the process recovering left over charcoal and metal.