The Wiki for Tale 8 is in read-only mode and is available for archival and reference purposes only. Please visit the current Tale 11 Wiki in the meantime.

If you have any issues with this Wiki, please post in #wiki-editing on Discord or contact Brad in-game.

Difference between revisions of "Gyration Cell"

From A Wiki in the Desert
Jump to navigation Jump to search
(Imported from T7)
 
m (Removing T7 Warning template that's kind of pointless now and likely no longer accurate)
 
(7 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
{{Languages}}
 
{{Languages}}
<br>
 
  
{{Template:BuildingInfo|image=Gyro.jpg|size=7x7|where=[[where::Compound]]|description=Non-Polluting ore smelting.}}
 
  
== Source ==
+
 
 +
{{Building
 +
| name        = Gyration Cell
 +
| image        = Gyro.jpg
 +
| location    = [[Compound]]
 +
| size        = 7 × 7
 +
| requirements =
 +
* [[Metallurgy]] 3
 +
| material1    = [[Boards]]
 +
| qty1        = 1000
 +
| material2    = [[Clay]]
 +
| qty2        = 500
 +
| material3    = [[Concrete]]
 +
| qty3        = 250
 +
| material4    = [[Copper Sheeting]]
 +
| qty4        = 50
 +
| material5    = [[Crucibles]]
 +
| qty5        = 12
 +
| material6    = [[Glass Pipe]]
 +
| qty6        = 20
 +
| material7    = [[Leather]]
 +
| qty7        = 100
 +
| material8    = [[Moon Steel]]
 +
| qty8        = 50
 +
| material9    = [[Pulley]]
 +
| qty9        = 10
 +
| material10  = [[Tin Sheeting]]
 +
| qty10        = 25
 +
}}
 +
 
 +
== Sources ==
 
This building becomes available after you have learned the [[Metallurgy 3]] tech.   
 
This building becomes available after you have learned the [[Metallurgy 3]] tech.   
  
Compare all [[Furnace | Furnaces]].
+
Compare all [[Furnace]]s.
 
 
  
 
== Cost ==
 
== Cost ==
 
{{7ok}}
 
 
* 1000 [[Boards]]
 
* 1000 [[Boards]]
 
* 500 [[Clay]]
 
* 500 [[Clay]]
Line 28: Line 53:
  
 
== Use ==
 
== Use ==
* Smelt [[Mine| Metal Ore]] to produce Metal
+
* Smelt [[Mine|Metal Ore]] to produce Metal
  
  
Uses up to 50 [[fuel::Charcoal]] for fuel.
+
Uses up to 50 [[Charcoal]] for fuel.
  
 
After firing, the metal will be ready in 15 minutes (if fully loaded with Charcoal) and will stay in the furnace until removed.
 
After firing, the metal will be ready in 15 minutes (if fully loaded with Charcoal) and will stay in the furnace until removed.
Line 70: Line 95:
  
  
*<b>Conjecture:</b> 1500/150=10 implies that 10 ore cooked for 15 minutes will yield 1 metal.  But this is without rounding.  With rounding, you get 5 ore yields 1 metal, 15 ore yields 2, ''n*10-5'' ore yields ''n'' metal, etc. in 15 minutes.  Of course, with the cooking cost being 50 CC, extra efficiency comes at a high cost in the renewable charcoal.
+
*'''Conjecture:''' 1500/150=10 implies that 10 ore cooked for 15 minutes will yield 1 metal.  But this is without rounding.  With rounding, you get 5 ore yields 1 metal, 15 ore yields 2, ''n*10-5'' ore yields ''n'' metal, etc. in 15 minutes.  Of course, with the cooking cost being 50 CC, extra efficiency comes at a high cost in the renewable charcoal.
  
  
*<b>Rounds Up:</b> Always load in numbers ending in 0 or 5. If you are loading the max of 1500, then load 1495 instead.  It will still yield 150 iron.  Load 95 (instead of 100) and you will get 10 iron. Never load with numbers ending with 1-4 else it still rounds down and you wasted your extra 1-4 ore.  Loading a number ending with 6-9 will also waste ore. - Cegaiel
+
*'''Rounds Up:''' Always load in numbers ending in 0 or 5. If you are loading the max of 1500, then load 1495 instead.  It will still yield 150 iron.  Load 95 (instead of 100) and you will get 10 iron. Never load with numbers ending with 1-4 else it still rounds down and you wasted your extra 1-4 ore.  Loading a number ending with 6-9 will also waste ore. - Cegaiel
  
  
<b>Optimal Yield Chart:</b>
+
'''Optimal Yield Chart:'''
  
 
{| border="1"
 
{| border="1"
Line 104: Line 129:
  
 
{{MetalworkNav | Furnaces}}
 
{{MetalworkNav | Furnaces}}
 
{{PublicUsableOnes}}
 
 
  
 
[[Category:Buildings]]
 
[[Category:Buildings]]
 
[[Category:Furnaces]]
 
[[Category:Furnaces]]
 +
 +
{{L|en}}

Latest revision as of 07:25, 7 August 2019

English français


Gyration Cell
Gyration Cell
(Building)
Location
Compound
Size
7 × 7
Requirements
Cost to Build
Boards 1,000
Clay 500
Concrete 250
Leather 100
Copper Sheeting 50
Moon Steel 50
Tin Sheeting 25
Glass Pipe 20
Crucibles 12
Pulley 10


Sources

This building becomes available after you have learned the Metallurgy 3 tech.

Compare all Furnaces.

Cost

Built in a Compound. Uses 7x7 cells.


Use


Uses up to 50 Charcoal for fuel.

After firing, the metal will be ready in 15 minutes (if fully loaded with Charcoal) and will stay in the furnace until removed.

Operation

A Gyration Cell holds up to 1500 ore and 50 Charcoal.

1500 ore, 50 Charcoal for 15 minutes yields 150 metal.
750 ore, 50 Charcoal for 15 minutes yields 75 metal.
In general, X ore, 50 Charcoal for 15 minutes yields X/10 metal.

Be careful : if you open the gyration cell while functioning, all the ore and charcoal will be wasted, only the metal already produced will remain.


Yield

Ore Used CC Used Metal Yield Time opened Ore Cost/Metal
1500 50 150 15 mins 10
100 50 10 15 mins 10
1000 50 100 15 mins 10


  • Conjecture: 1500/150=10 implies that 10 ore cooked for 15 minutes will yield 1 metal. But this is without rounding. With rounding, you get 5 ore yields 1 metal, 15 ore yields 2, n*10-5 ore yields n metal, etc. in 15 minutes. Of course, with the cooking cost being 50 CC, extra efficiency comes at a high cost in the renewable charcoal.


  • Rounds Up: Always load in numbers ending in 0 or 5. If you are loading the max of 1500, then load 1495 instead. It will still yield 150 iron. Load 95 (instead of 100) and you will get 10 iron. Never load with numbers ending with 1-4 else it still rounds down and you wasted your extra 1-4 ore. Loading a number ending with 6-9 will also waste ore. - Cegaiel


Optimal Yield Chart:

Ore Used CC Used Metal Yield Time opened Ore Cost/Metal
1495 50 150 15 mins 10
95 50 10 15 mins 10
995 50 100 15 mins 10

You don't need to load the exact ore amounts in charts above, just remember its 10% metal of the amount of ore you load. You still always use 50cc. Again, always load in a number ending with 5 for optimal yield.