Difference between revisions of "Brick Machine"
From A Wiki in the Desert
Line 1: | Line 1: | ||
− | Upgrade cost: | + | Upgrade 1 cost: |
* 4 [[Copper Sheeting]] | * 4 [[Copper Sheeting]] | ||
* 300 [[Concrete]] | * 300 [[Concrete]] | ||
* 50 [[Board]] | * 50 [[Board]] | ||
+ | Upgrade 2 cost: | ||
+ | * 20 [[Steel Sheeting]] | ||
+ | * 500 [[Concrete]] | ||
+ | * 150 [[Board]] |
Revision as of 11:54, 20 January 2019
Upgrade 1 cost:
- 4 Copper Sheeting
- 300 Concrete
- 50 Board
Upgrade 2 cost:
- 20 Steel Sheeting
- 500 Concrete
- 150 Board