Difference between revisions of "Hades Furnace"
m (Removing old Languages template) |
m (→top: smwifying) |
||
Line 8: | Line 8: | ||
| name = Hades Furnace | | name = Hades Furnace | ||
| image = Hadesfurnace.jpg | | image = Hadesfurnace.jpg | ||
− | | location = [[Medium Construction Site]] | + | | location = [[requires::Medium Construction Site]] |
| size = | | size = | ||
| requirements = | | requirements = | ||
− | * [[Metallurgy]] 2 | + | * [[requires::Metallurgy]] 2 |
− | | material1 = [[Aluminum Plate]] | + | | material1 = [[requires::Aluminum Plate]] |
| qty1 = 2 | | qty1 = 2 | ||
− | | material2 = [[Boards]] | + | | material2 = [[requires::Boards]] |
| qty2 = 5000 | | qty2 = 5000 | ||
− | | material3 = [[Clay Bricks]] | + | | material3 = [[requires::Clay Bricks]] |
| qty3 = 5000 | | qty3 = 5000 | ||
− | | material4 = [[Copper Sheeting]] | + | | material4 = [[requires::Copper Sheeting]] |
| qty4 = 100 | | qty4 = 100 | ||
− | | material5 = [[Crucibles]] | + | | material5 = [[requires::Crucibles]] |
| qty5 = 30 | | qty5 = 30 | ||
− | | material6 = [[Cut Stone]] | + | | material6 = [[requires::Cut Stone]] |
| qty6 = 500 | | qty6 = 500 | ||
− | | material7 = [[Fine Glass Pipe]] | + | | material7 = [[requires::Fine Glass Pipe]] |
| qty7 = 20 | | qty7 = 20 | ||
− | | material8 = [[Iron Bars]] | + | | material8 = [[requires::Iron Bars]] |
| qty8 = 75 | | qty8 = 75 | ||
− | | material9 = [[Iron Strap]] | + | | material9 = [[requires::Iron Strap]] |
| qty9 = 75 | | qty9 = 75 | ||
− | | material10 = [[Pulley]] | + | | material10 = [[requires::Pulley]] |
| qty10 = 25 | | qty10 = 25 | ||
− | | material11 = [[Steel Sheeting]] | + | | material11 = [[requires::Steel Sheeting]] |
| qty11 = 300 | | qty11 = 300 | ||
− | | material12 = [[Thermometer]] | + | | material12 = [[requires::Thermometer]] |
| qty12 = 3 | | qty12 = 3 | ||
− | | material13 = [[Tin Sheeting]] | + | | material13 = [[requires::Tin Sheeting]] |
| qty13 = 15 | | qty13 = 15 | ||
}} | }} |
Revision as of 15:24, 19 September 2019
Hades Furnace | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
(Building) | ||||||||||||||||||||||||||||
Location | ||||||||||||||||||||||||||||
Medium Construction Site | ||||||||||||||||||||||||||||
Requirements | ||||||||||||||||||||||||||||
|
Sources
This building becomes available after the Metallurgy 2 technology is learned at a University of Harmony.
Compare all Furnaces.
Cost
- 2 Aluminum Plate
- 5000 Boards
- 5000 Clay Bricks
- 100 Copper Sheeting
- 30 Crucibles
- 500 Cut Stone
- 20 Fine Glass Pipe
- 75 Iron Bars
- 75 Iron Strap
- 25 Pulley
- 300 Steel Sheeting
- 3 Thermometers
- 15 Tin Sheeting
Use
- Smelts all metals
Uses Petroleum for fuel.
Notes
- Holds 1000 Petroleum
- Max runtime is 20d 9h 47m 45s
- Burns 49 petrol per day (49 ticks per day)
- No pollution in T8
- Any ore not converted to metal will result in clinker when opened
Construction
To construct, place a Medium Construction Site at the desired location, then select Projects > Furnaces > Hades Furnace.
It must be built 65 or more coordinates away from any other Persephone Furnace or Hades Furnace.
- If there is a Persephone Furnace or Hades Furnace up to 64 coordinates away, you will get a dialog box, "You must locate any water cooled furnace at least 64 coordinates from any other".
- Has to be 65 or more coords away in both north-south coordinate AND east-west coordinate
It must be built near a water source and away from a road
- If there is no water nearby, or if you construct too close to a road, you will get a dialog box, "Hades Furnaces are cooled with water, and must be built near a natural source, and away from paths."
- A Water icon does not necessarily meet the requirements, and equally you can build where you don't get a water icon.
To prevent attempting to circumvent the distance restriction by constructing two furnaces at the same time or by repositioning it after construction, every time you fire a Persephone Furnace or Hades Furnace a check is made for any furnaces nearby. If there is another furnace 64 coords or less away, ALL affected furnaces will display in the main channel Operating a water cooled furnace too close to another causes it to become unstable. It will not operate when attempting to fire it.
Yield
Ore Used | Petrol Used | Metal Yield | Time opened | Ore Cost/Metal | % Yield | Notes |
---|---|---|---|---|---|---|
20000 | 3 | 240 | 1,5 hours | 83.33 | 1.20% | |
20000 | 4 | 300 | 2 hours | 66.67 | 1.50% | |
20000 | 5 | 380 | 2,5 hours | 52.63 | 1.90% | |
20000 | 6 | 440 | 3 hours | 45.45 | 2.20% | |
20000 | 7 | 500 | 3,5 hours | 40.00 | 2.50% | |
20000 | 8 | 580 | 4 hours | 34.48 | 2.90% | |
20000 | 9 | 640 | 4,5 hours | 31.25 | 3.20% | |
20000 | 10 | 680 | 5 hours | 29.41 | 3.40% | |
20000 | 12 | 800 | 6 hours | 25.00 | 4.00% | |
20000 | 13 | 860 | 6,5 hours | 23.26 | 4.30% | |
20000 | 14 | 920 | 7 hours(+4min) | 21.74 | 4.60% | |
20000 | 16 | 1000 | 8 hours | 20.00 | 5.00% | |
20000 | 47 | 1960 | 23 hours | 10.20 | 9.80% | |
20000 | 48 | 1980 | 23,5 hours | 10.10 | 9.90% | |
20000 | 49 | 2000 | 24 hours | 10.00 | 10.00% | Gyration Cell Equiv. |
20000 | 64 | 2280 | 1d 7h 33m | 8.77 | 11.40% | |
20000 | 87 | 2560 | 1d 18h 35m | 7.81 | 12.80% | |
20000 | 98 | 2660 | 48 hours | 7.52 | 13.30% | |
20000 | 131 | 2920 | 2d 16h | 6.85 | 14.60% | Sweet Spot |
20000 | 147 | 3000 | 72 hours | 6.67 | 15.00% | Sweet Spot |
20000 | 179 | 3140 | 3d 15h | 6.37 | 15.70% | Sweet Spot |
20000 | 196 | 3200 | 96 hours | 6.25 | 16.00% | Sweet Spot |
20000 | 198 | 3200 | 4d 1h | 6.25 | 16.00% | |
20000 | 228 | 3300 | 4d 15h | 6.06 | 16.50% | |
20000 | 252 | 3340 | 5d 3h 30m | 5.99 | 16.70% | |
20000 | 319 | 3460 | 6d 12h 15m | 5.78 | 17.30% | |
20000 | 343 | 3500 | 7d | 5.71 | 17.50% | |
20000 | 401 | 3560 | 8d 4h 9m | 5.62 | 17.80% | |
20000 | 472 | 3620 | 9d 15h 15m | 5.52 | 18.10% | |
20000 | 472 | 3700 | 12d 11h 37m | 5.41 | 18.50% | |
20000 | 779 | 3760 | 15d 21h 23m | 5.32 | 18.80% | |
20000 | 888 | 3800 | 18d 3h 4m | 5.26 | 19.00% | |
20000 | 999 | 3820 | 20d 9h 19m | 5.24 | 19.10% | |
20000 | 1000 | 3820 | 20d 9h 47m | 5.24 | 19.10% | What's the point? |
Related Pages