A Wiki in the Desert
Log in

Difference between revisions of "Guilds/Alpha/Projects"

From A Wiki in the Desert
Line 20: Line 20:
 
| Black Raeli Tiles || 12,000 ||Done
 
| Black Raeli Tiles || 12,000 ||Done
 
|-
 
|-
| Bolt || 500 ||
+
| Bolt || 500 || Done
 
|-
 
|-
| Brass Small Gears || 100 ||
+
| Brass Small Gears || 100 || Done
 
|-
 
|-
| Clay Bricks || 10,000 || 10,000
+
| Clay Bricks || 10,000 || Done
 
|-
 
|-
 
| Clay Steeped Wool Cloth || 40 ||
 
| Clay Steeped Wool Cloth || 40 ||
Line 38: Line 38:
 
| Hard, Rigid, Fireproof Boards || 8,200 || 8,200
 
| Hard, Rigid, Fireproof Boards || 8,200 || 8,200
 
|-
 
|-
| Iron Bars || 125 ||
+
| Iron Bars || 125 || Done
 
|-
 
|-
| Iron Large Gears || 10 ||
+
| Iron Large Gears || 10 || Done
 
|-
 
|-
| Iron Medium Gears || 5 ||
+
| Iron Medium Gears || 5 || Done
 
|-
 
|-
 
| Iron Strap || 150 ||
 
| Iron Strap || 150 ||
 
|-
 
|-
| Lubricating Oil || 60 || 60
+
| Lubricating Oil || 60 || Done
 
|-
 
|-
| Medium Steam Egnine || 3 || 3
+
| Medium Steam Egnine || 3 || Done
 
|-
 
|-
 
| Octec’s Alloy Cable || 15 ||
 
| Octec’s Alloy Cable || 15 ||
Line 56: Line 56:
 
| Plaster || 4,500 ||
 
| Plaster || 4,500 ||
 
|-
 
|-
| Thermometer || 10 || 10
+
| Thermometer || 10 || Done
 
|-
 
|-
| Washer || 500 ||
+
| Washer || 500 || Done
 
|-
 
|-
 
| Water || 2,500 ||
 
| Water || 2,500 ||

Revision as of 18:20, 26 March 2020


For the Camp in General

For the Orchard (200 trees)

    • 200 canvas (small construction sites)
    • 800 rope (small construction sites)
    • 4000 boards (small construction sites)
    • 400 papy baskets
    • 2400 linen
    • 40000 clay

Steam Distaff and 2 Steam Kilns, Fully Upgraded

Item Total Made
Black Raeli Tiles 12,000 Done
Bolt 500 Done
Brass Small Gears 100 Done
Clay Bricks 10,000 Done
Clay Steeped Wool Cloth 40
Concrete 7,100
Copper Pipes 155
Copper Sheeting: Stainless Insulative 180
Firebricks 4,000
Hard, Rigid, Fireproof Boards 8,200 8,200
Iron Bars 125 Done
Iron Large Gears 10 Done
Iron Medium Gears 5 Done
Iron Strap 150
Lubricating Oil 60 Done
Medium Steam Egnine 3 Done
Octec’s Alloy Cable 15
Octec’s Alloy Wire 300
Plaster 4,500
Thermometer 10 Done
Washer 500 Done
Water 2,500
White Raeli Tiles 3,500 Done