A Wiki in the Desert
Log in

Meshwesh Waterworks

From A Wiki in the Desert
Revision as of 02:55, 28 February 2020 by Tortellini (talk | contribs) (→‎Towers)

Welcome to Meshwesh Waterworks

    The guildhall is located @ 1005,7012 just north of the Tanis CS. Construction warehouses are @ 737,7064. We welcome players from all factions to join. First towers will be given to those that help build the pump.
 *** This is a work guild. Leave your drama at the door or you will be removed with no return of any donated materials. Please /chat me with what you have donated so that you can get credit for the contribution. ***

Aqueduct

Aqueduct Map

Raeli Ovens

Marble Quarries

Raising the Pump

Towers

block
Black Raeli Tiles
2289
/
1000
(-1289)
228%
Blueish Raeli Tiles
1250
/
250
(-1000)
500%
Greenish Raeli Tiles
264
/
250
(-14)
105%
Reddish Raeli Tiles
2346
/
250
(-2096)
938%
White Raeli Tiles
600
/
500
(-100)
120%
Yellowish Raeli Tiles
300
/
250
(-50)
120%
Cisterns
5
/
5
(0)
100%
Concrete
300
/
500
(200)
60%
Copper Pipes
52
/
25
(-27)
208%
Tar
560
/
60
(-500)
933%
Pipe Segment
255
/
200
(-55)
127%
Bricks (estimated)
29742
/
30000
(258)
99%
Concrete (estimated raising)
214
/
500
(286)
42%
Cut stone (estimated)
903
/
1500
(597)
60%
block
block
Gearbox A329-A411 G438-G512
1
/
1
(0)
100%
Gearbox A111-A132 G311-G367
0
/
1
(1)
0%
Gearbox C214-C246 F387-F445
1
/
1
(0)
100%
Gearbox A54-A64 G163-G196
1
/
1
(0)
100%
Gearbox B366-B428 G299-G365
1
/
1
(0)
100%
Gearbox B332-B408 H245-H287
0
/
1
(1)
0%
Gearbox B187-B217 G99-G118
0
/
1
(1)
0%
Gearbox A249-A299 F210-F263
0
/
1
(1)
0%
Gearbox A418-A497 F122-F144
0
/
1
(1)
0%
Gearbox C394-C453 H462-H578
0
/
1
(1)
0%
Gearbox A396-A459 G186-G223
0
/
1
(1)
0%
Gearbox A311-A379 G189-G231
0
/
1
(1)
0%
Gearbox B321-B369 G373-G463
0
/
1
(1)
0%
Gearbox B225-B272 G460-G552
0
/
1
(1)
0%
Gearbox A51-A61 F217-F267
0
/
1
(1)
0%
Gearbox B471-B542 H273-H333
0
/
1
(1)
0%
Gearbox A88-A110 G232-G271
0
/
1
(1)
0%
Gearbox A458-A573 F300-F369
0
/
1
(1)
0%
Gearbox B298-B367 H299-H374
0
/
1
(1)
0%
Gearbox A306-A358 F78-F90
0
/
1
(1)
0%
Pipe Segment
10
/
10
(0)
100%
Bricks (estimated)
29742
/
80000
(50258)
37%
Concrete (estimated raising)
0
/
2500
(2500)
0%
Cut stone (estimated)
0
/
767
(767)
0%
block