Pipe Segment
From A Wiki in the Desert
Revision as of 04:58, 3 March 2019 by Peacefulness (talk | contribs)
Pipe Segment | ||
---|---|---|
(Item) | ||
|
||
|
Uses
These are used to upgrade Aqueduct Tower in the Test of Life.
Cost
1 Pipe Segment (Wet). Fired in a Vault Kiln for 4 hours.
Required By
Produced By