Difference between revisions of "Guilds/Sheep Conspiracy Research/Flex"
From A Wiki in the Desert
Line 12: | Line 12: | ||
* Lubricating Oil 215 | * Lubricating Oil 215 | ||
* Metalwork: Copper Pipe 620 | * Metalwork: Copper Pipe 620 | ||
− | * Metalwork: Copper Sheeting: Hard, Stainless, Insulative 600 | + | * <s> Metalwork: Copper Sheeting: Hard, Stainless, Insulative 600 </s> |
− | * Metalwork: Copper Sheeting: Stainless Insulative 390 | + | * <s> Metalwork: Copper Sheeting: Stainless Insulative 390 </s> |
* Metalwork: Iron Bars 555 | * Metalwork: Iron Bars 555 | ||
* Metalwork: Iron Strap 675 | * Metalwork: Iron Strap 675 | ||
* Metalwork: Medium Flywheel 12 | * Metalwork: Medium Flywheel 12 | ||
− | * Metalwork: Octec's Alloy Cable 45 | + | * <s> Metalwork: Octec's Alloy Cable 45 </s> |
− | * Metalwork: Octec's Alloy Wire 1,200 | + | * <s> Metalwork: Octec's Alloy Wire 1,200 </s> |
* Metalwork: Steel Bars 840 | * Metalwork: Steel Bars 840 | ||
− | * Metalwork: Steel Sheeting 450 | + | * <s> Metalwork: Steel Sheeting 450 </s> |
* Metalwork: Washer 2,550 | * Metalwork: Washer 2,550 | ||
* Metalwork:: Bolt 2,550 | * Metalwork:: Bolt 2,550 |
Revision as of 23:50, 21 February 2022
- Assembly: High Pressure Steam Engine 5
- Assembly: Medium Steam Engine 7
- Boards 4,500/4,500
- Brickwork: Clay Bricks 22,500/22,500
- Brickwork: Firebricks 18,000/18,000
- Clothwork: Clay Steeped Wool Cloth 800
- Gearwork: Brass Small Gear 725
- Gearwork: Iron Large Gear 35
- Gearwork: Iron Medium Gears 156
- Glasswork: Thermometer 125
- Leather 600/600
- Lubricating Oil 215
- Metalwork: Copper Pipe 620
Metalwork: Copper Sheeting: Hard, Stainless, Insulative 600Metalwork: Copper Sheeting: Stainless Insulative 390- Metalwork: Iron Bars 555
- Metalwork: Iron Strap 675
- Metalwork: Medium Flywheel 12
Metalwork: Octec's Alloy Cable 45Metalwork: Octec's Alloy Wire 1,200- Metalwork: Steel Bars 840
Metalwork: Steel Sheeting 450- Metalwork: Washer 2,550
- Metalwork:: Bolt 2,550
- Pottery: Raeli Tiles - Black Raeli Tiles 26,000
- Pottery: Raeli Tiles - White Raeli Tiles 7,500
- Pottery:Water 7,750
- Stonework: Cement 500
- Stonework: Concrete 32,050
- Stonework: Plaster 9,750
- Treated Boards - Hard, Rigid, Fireproof 28,600