|
|
Line 80: |
Line 80: |
| This includes about a 20% overbuild in case we need to rebuild the site | | This includes about a 20% overbuild in case we need to rebuild the site |
| {{ResTechnology|Central Structure|state=collapse| | | {{ResTechnology|Central Structure|state=collapse| |
− | {{ResResource|Rope | 360 | 720 }} | + | {{ResResource|Rope | 720 | 720 }} |
− | {{ResResource|Canvas | 90 | 180 }} | + | {{ResResource|Canvas | 180 | 180 }} |
| {{ResResource|Boards | 2160 | 2160 }} | | {{ResResource|Boards | 2160 | 2160 }} |
| {{ResResource|Brass Plate | 5 | 5 }} | | {{ResResource|Brass Plate | 5 | 5 }} |
Revision as of 12:07, 31 January 2020
Aqueduct
Aquaduct Map
Pump (280, -6588) - Built
Raising the Pump to 200m - Complete
Cistern Upgrade to 500,000 litres
26 Aqueduct Construction Sites
25 Towers
Raising 25 Towers
Mega (58, -7232)
Warehouses at (70, -7200)
Central Structure
This includes about a 20% overbuild in case we need to rebuild the site
Materials (Minimum)
Have on hand before we build
Materials (Actual)
Will update after the site is up
Completed Structures
Builders
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
- 31.
- 32.
- 33.
- 34.
- 35.
- 36.
- 37.
- 38.
- 39.
- 40.
- 41.
- 42.
- 43.
- 44.
- 45.
- 46.
- 47.
- 48.
- 49.