Steam Rock Saw
Steam Rock Saw | ||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
(Building) | ||||||||||||||||||||||||||||
Location | ||||||||||||||||||||||||||||
Compound | ||||||||||||||||||||||||||||
Size | ||||||||||||||||||||||||||||
16 x 11 | ||||||||||||||||||||||||||||
Requirements | ||||||||||||||||||||||||||||
|
This is an automated Rock Saw. A Steam Rock Saw consumes Petroleum.
Production
You first have to configure the hopper to cut either Cuttable Stone or Medium Stones. You can cut Cuttable Stones into Cut Stones or Pulley and Medium Stones into Flystones. Notice that when installing a springbox, the quality of the spring matters a lot. The difference between poor and high quality can be twice the production.
Upgrade Levels
First Capacity Upgrade
After the first upgrade, can be loaded up to 500 Cuttable Stones or Medium Stones.
Cost
- 50 Steel Bars
✓ - 500 Treated Boards - Hard, Rigid, Fireproof
✓ - 150 Plaster
✓ - 150 Concrete
✓ - 25 Iron Strap
✓ - 100 Octec's Alloy Wire
✓
Second Capacity Upgrade
After the second upgrade, can be loaded up to 1,000 Cuttable Stones or Medium Stones.
Cost:
- 150 Bolt
✓ - 150 Washer
✓ - 100 Steel Bars
✓ - 500 Treated Boards - Hard, Rigid, Fireproof
✓ - 25 Iron Bars
✓ - 35 Copper Pipe
✓ - 50 Iron Strap
✓